CASE STUDIES
Statewide Industrial Maintenance and Instagrid Integration
CLIENT
Statewide Industrial Maintenance
LOCATION
Perth, Western Australia
SECTOR
Engineering / Temporary Power / Manufacturing
APS partners with Statewide Industrial Maintenance to replace petrol generators with the Instagrid battery, boosting efficiency, reducing noise, and meeting ISO14001 standards.
- CLIENT CHALLENGE

- OUR SOLUTION
Instagrid One
Recognising these challenges, APS introduced Statewide Industrial Maintenance to the Instagrid, a portable battery system designed for high-power applications. When contacted, Statewide had multiple maintenance tasks that required temporary power, and the Instagrid was the perfect fit for their needs.
For two consecutive days, Statewide utilised the Instagrid for their maintenance operations without needing to recharge the battery. The outcomes were impressive, including:
Pipe Cutting: 8 cuts made into 6mm pipe at lengths of 1400mm each.
Bracing: Tacking up 16 pieces of bracing.
Welding: Completing a series of 6mm continious fillets utilsining 3.2mm 16TC electrodes.
- THE RESULT
Transition to the Instagrid provided many advantages
Noise Reduction: The Instagrid eliminated the need for a traditional petrol generator, significantly reducing noise levels on-site and creating a quieter working environment.
Environmental Impact: The use of a battery-powered system aligns with Statewide’s commitment to ISO14001 standards. This move supports their proactive environmental management efforts, helping to minimize their overall ecological footprint.
Cost Savings: By opting for the Instagrid, Statewide could cut down on operational costs related to petrol, maintenance of the generator, and associated emissions.
Efficiency Boost: The ease of setup and lightweight design of the Instagrid allowed for uninterrupted workflow, enabling the team to focus on tasks without the logistical challenges posed by a traditional generator.

- PROJECT OUTCOME
FROM THE CLIENT
“Being able to easily transport your powersource without the need for a forklift, crane or telehandler was extremely convenient, especially when working at heights, or in the case, on a construction site with no power facilities. It also allowed us to run 4mm 16TC electrodes at around 150A which our smaller generators are unable to handle the draw and trips out”
James Gaudieri - Director of Statewide industrial MAINTENANCE
READY TO PARTNER WITH APS FOR YOUR POWER PROJECT?
APS offers cutting-edge technology and exceptional quality to elevate your projects. Enhance your productivity and achieve exceptional results. Choose the perfect power partnership and elevate your projects to new heights APS. Get in touch with us today on (08) 9455 2111.