Powering HTS Constructions Temporary Site Facilities
CLIENT
HTS Construction
LOCATION
Miling, Western Australia
SECTOR
Construction / Temporary Power / Site Facilities
APS delivers efficient temporary power solutions for HTS Construction at remote Mining site, enhancing operational efficiency and reducing diesel consumption.
CLIENT CHALLENGE
APS was retained by HTS Construction, a pioneering construction company renowned for delivering bespoke solutions to various projects across Australia. HTS approached APS with a requirement for temporary power solutions to support their site facilities at the remote location of Miling, where grid connection was unavailable. Given the site’s proximity to Perth (approximately 2.5 hours north), HTS sought a solution that would not only minimise diesel consumption due to limited refuelling options but also extend the servicing intervals and downtime of their existing generator, thereby optimising overall operational efficiency.
SOLUTION HIGHLIGHTS
OUR SOLUTION
Ecosun Trailer-Watt 15s Trailer
PROJECT OUTCOME
Power requirements fulfilled
KEY OUTCOME
96% IN FUEL REDUCTION
Conversely, the evening hours witness a significant decrease in load as only essential appliances such as lighting, refrigeration units, and computers remain active. The Trailer-Watt’s 23kWh onboard storage capacity enables it to efficiently manage this fluctuating demand, maintaining a stable supply while preserving reserve capacity for morning peak periods. By utilizing this innovative solution, HTS achieved significant reductions in fuel consumption, CO2 emissions, and noise pollution compared to traditional diesel generators. With its versatility and scalability, the Ecosun Trailer-Watt is poised to excel in a wide range of applications across various projects and locations, effortlessly integrating into even the most complex power infrastructure.