Innovative Power Solutions in Challenging Locations

CASE STUDIES CLIENT FREDON WA LOCATION Scarborough, Western Australia Supporting Fredon at Scarborough’s iconic Rendezvous Hotel with a low-noise, low-emission Hybrid Power Solution, delivering reliable performance in one of Perth’s busiest neighbourhoods. CLIENT CHALLENGE APS was engaged by Fredon WA to support a project at the Rendezvous Hotel in Perth, where the team needed a […]
Optimising Battery Sizing for Maximum Efficiency

CASE STUDIES CLIENT Monadelphous LOCATION Greenbushes, Western Australia APS Power worked closely with Monadelphous to integrate a Battery Energy Storage System (BESS) for a trial period, that could reduce reliance on traditional generators and lower CO₂ emissions. CLIENT CHALLENGE Monadelphous investigated flexible power solutions capable of adapting to increasing power requirements as site work ramps […]
Working with WPG on powering temporary site facilities

CASE STUDIES CLIENT West Power Group (WPG) LOCATION Perth, Western Australia APS and WPG collaborated on a Perth Metro project, powering site facilities 24/7. Together, they worked to reduce CO₂ emissions and diesel consumption for the office compound. CLIENT CHALLENGE Like many construction projects, the client faced an increase in staffing requirements over the duration […]
Integrating one battery system across two states

CASE STUDIES CLIENT Duratec LOCATION Karratha, Western Australia & Melbourne, Victoria APS Power and Duratec collaborate to integrate Instagrid One battery system across seperate projects located in Western Australia and Victoria. CLIENT CHALLENGE The client faced the challenge of providing reliable power for a wide range of demanding tasks across multiple projects. The Melbourne site […]
Statewide Industrial Maintenance and Instagrid Integration

CASE STUDIES CLIENT Statewide Industrial Maintenance LOCATION Perth, Western Australia SECTOR Engineering / Temporary Power / Manufacturing APS partners with Statewide Industrial Maintenance to replace petrol generators with the Instagrid battery, boosting efficiency, reducing noise, and meeting ISO14001 standards. CLIENT CHALLENGE Statewide Industrial Maintenance, a privately owned company based in Perth, is dedicated to providing […]
Powering HTS Constructions Temporary Site Facilities

CASE STUDIES CLIENT HTS Construction LOCATION Miling, Western Australia SECTOR Construction / Temporary Power / Site Facilities APS delivers efficient temporary power solutions for HTS Construction at remote Mining site, enhancing operational efficiency and reducing diesel consumption. CLIENT CHALLENGE APS was retained by HTS Construction, a pioneering construction company renowned for delivering bespoke solutions to […]